Ulster University Logo

Probability distribution fitting of schedule overruns in construction projects

Love, P E D, Sing, C-P, Wang, X, Edwards, D J and Odeyinka, H (2013) Probability distribution fitting of schedule overruns in construction projects. Journal of the Operational Research Society, 64 . pp. 1231-1247. [Journal article]

Full text not available from this repository.

URL: http://dx.doi.org/10.1057/jors.2013.29

DOI: doi:10.1057/jors.2013.29


Item Type:Journal article
Faculties and Schools:Faculty of Art, Design and the Built Environment
Faculty of Art, Design and the Built Environment > School of the Built Environment
Research Institutes and Groups:Built Environment Research Institute > Centre for Sustainable Technologies (CST)
Built Environment Research Institute
ID Code:25334
Deposited By: Mrs Sadie Magee
Deposited On:09 Apr 2013 15:17
Last Modified:16 Jul 2013 11:13

Repository Staff Only: item control page