Abstract

Purpose – Construction organisations are mandated to use Building Information Modelling (BIM)for Government projects from 2016. The purpose of this paper is to investigate the current status of the management aspects of BIM.Design/methodology/approach – Following a telephone sift, a web-based questionnaire wasconducted with UK construction BIM experts with 92 responses.Findings – This research demonstrates a paradigm shift in construction as operations were deemedmore important than the technical aspects of BIM Adoption. Respondents agree with enforced Level 2 BIM, demonstrating client demand is a significant driver on uptake. BIM use will substantially increase in the next five years. Ranking of the importance of current BIM standards indicated BS1192 was most used but almost a third adopted individual standards producing fragmentation. BIM’s effect on consultant fees indicated the need for structural change.Practical implications – Front end design via BIM models and clash detection outweighed the usefor facilities management indicating industry were meeting the target but not exploiting BIM to its fullpotential. Design and build and framework arrangements were the most common BIM procurementroutes. Fragmentation of standards use creates a future interoperability problem between BIMsystems.Social implications – Design team structure changes are supported with the adoption of a separateBIM manager being popular. Analysis of industry-wide model hosting characteristics indicatedindividual disciplines managed their own models meaning without an additional target for Level 3 BIM the single model environment is unlikely to be widely adopted.Originality/value – BIM fee structure and procurement are investigated for the first timeKeywords Procurement, BIM, Finance, Management, Collaboration, FeesPaper type Research paper

Item Type:Journal article
Keywords:Procurement, BIM, Finance, Management, Collaboration, Fees
Faculties and Schools:Faculty of Art, Design and the Built Environment
Faculty of Art, Design and the Built Environment > School of the Built Environment
Research Institutes and Groups:Built Environment Research Institute
Built Environment Research Institute > Studies Allied to Built Environment Research (SABER)
ID Code:30919
Deposited By: Dr Robert Eadie
Deposited On:02 Feb 2015 14:22
Last Modified:23 Mar 2017 14:09

Repository Staff Only: item control page