Modelling Construction Innovation Contraints: A Tool for Sustaining Innovation in Projects

Murphy, Martina, Perera, Srinath and Heaney, George (2013) Modelling Construction Innovation Contraints: A Tool for Sustaining Innovation in Projects. In: Creative Construction Conference, Budapest, Hungary. Róbert Hohol, Diamond Congress Ltd.,. 942 pp. [Conference contribution]

This is the latest version of this item.

[img] Text - Published Version
402kB

URL: http://2013.creative-construction-conference.com/img/nicedit/CC2013-Proceedings.pdf

Abstract

There is concern that the construction industry lacks the ability to effectively sustain product innovation through the project process. A review of literature identifies lost opportunities where product innovations were introduced into construction projects but poorly managed, thus not fully implemented. Whilst literature points to project constraints for this failure it is proposed that the problem lies rather in the failure of stakeholders to adequately manage the constraints. Previous construction innovation research has failed to substantially evaluate and priortise constraints in implementing innovations into projects thus leading to a gap in knowledge of how Project Managers might manage these constraints to ensure successful adoption of the innovation. This paper presents a methodology for quantifying and modelling innovation constraints using FMEA and Perceptual Mapping techniques.An iterative grounded theory approach was used to identify constraint data from 30 case studies of construction projects where a product innovation was introduced. Constraint data was extracted and quantified from the case studies using content analysis and Failure Mode and Effect Analysis (FMEA). The resultant data was subject to manipulation using perceptual mapping techniques to formulate an Innovation Management Flowchart (IMF) and Constraint Classification Matrix (CCM). These outputs map the critical management tasks with the appropriate stakeholder responses to determine the optimum workflow sequence required to successfully implement an innovation into a construction project. A key attribute of Perceptual Mapping is that it can communicate both qualitative as well as quantitative information thereby enabling the outputs to be used by non-academic beneficiaries. The benefit of this research is an established methodology and communication framework which can be used by Project Managers to inform the risk management strategy for their projects.

Item Type:Conference contribution (Paper)
Keywords:FMEA, innovation constraints, perceptual mapping, procurement, product innovation
Faculties and Schools:Faculty of Art, Design and the Built Environment
Faculty of Art, Design and the Built Environment > School of the Built Environment
Research Institutes and Groups:Built Environment Research Institute
Built Environment Research Institute > Studies Allied to Built Environment Research (SABER)
ID Code:36950
Deposited By: Dr Martina Murphy
Deposited On:30 Mar 2017 14:25
Last Modified:17 Oct 2017 16:27

Available Versions of this Item

Repository Staff Only: item control page